Reference details

Innovation of wiring of two-channel preheating hall - Ústav využití plynu Brno s.r.o.

<p>Delivery of new power and operating switchboard including new HW and operating SW. Two PCs with touch screen are installed in operating boxes for displaying and entering parameters. The equipment is controlled by control system TC700 (TECO Kolín). Project documentation and operational documentation, a testing protocol of a power distributor.</p>