On 5 December 2013 a project documentation of high-voltage and low-voltage current wiring of renovated premises of Labour Office in Hodonín was submitted. The high-voltage current wiring includes complete replacement of the power, socket and light cablings and replacement of the switchboards. The low-voltage current wiring will include replacement of existing reserve system.
On 21 November 2013 a contract with the company Ústav využití plynů Brno s.r.o. for innovation of wiring of two-chanel preheating hall for kiln car in Dinas Svitavy was signed. The subject of the contract is supply of new power and operating switchboard including new HW an operating SW. Two PC´s with touch screen will be installed in operating boxes for displaying and entering parameters. The equipment will be controlled by control system TC700 (TECO Kolín).
On 12 September 2013 a contract with the company Mlýn Herold, spol. s r.o. for supply of electric parts including controlling HW and SW for fermentative production containers, ferment tanks and pumping was signed. The equipment will be controlled by a system Foxtrot (TECO Kolín).